Please use this identifier to cite or link to this item:
https://hdl.handle.net/10321/4493
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Mdletshe, Mfundo | en_US |
dc.contributor.author | Dewa, Mendon | en_US |
dc.contributor.editor | Hattingh, Teresa | - |
dc.date.accessioned | 2022-11-07T06:53:20Z | - |
dc.date.available | 2022-11-07T06:53:20Z | - |
dc.date.issued | 2022-10-03 | - |
dc.identifier.citation | Mdletshe, M. and Dewa, M. 2022. Process improvement for the manufacture of excavator bucket for a construction equipment manufacturer. Proceedings of the 33rd Annual Southern African Institute of Industrial Engineering Conference. Presented at: 33rd Annual Southern African Institute of Industrial Engineering Conference: 238-248 (11). | en_US |
dc.identifier.issn | 2308-8265 | - |
dc.identifier.uri | https://hdl.handle.net/10321/4493 | - |
dc.description.abstract | A construction equipment manufacturer procured the SK220 excavator machine from Japan without the bucket. Given the poor quality of outsourced buckets, the company considered manufacturing its own strong and reliable excavator buckets. However, due to Covid 19 pandemic, the company failed to deliver the buckets on time, which affected committed customer orders. The aim of the paper is to pinpoint the bottlenecks within the supply chain and institute some corrective and preventive actions to improve the manufacture of excavator bucket for the construction equipment manufacturer. Capacity planning was conducted to establish the weekly production capacity for the excavator bucket, considering the number of workers and equipment. Root cause analysis was conducted to pinpoint all the waste that characterised the supply chain and significant counter-measures were implemented. The results demonstrated significant productivity improvement, waste reduction and average in monthly sales amounting to R6 250 000. | en_US |
dc.format.extent | 11 p | en_US |
dc.language.iso | en | en_US |
dc.publisher | Southern African Institute for Industrial Engineering | en_US |
dc.relation.ispartof | 33rd Annual Southern African Institute of Industrial Engineering Conference | en_US |
dc.subject | Excavator bucket, | en_US |
dc.subject | Supply chain | en_US |
dc.subject | Lean | en_US |
dc.subject | Six sigma | en_US |
dc.title | Process improvement for the manufacture of excavator bucket for a construction equipment manufacturer | en_US |
dc.type | Conference | en_US |
dc.date.updated | 2022-10-20T16:36:13Z | - |
dcterms.dateAccepted | 2022-10-3 | - |
item.languageiso639-1 | en | - |
item.fulltext | With Fulltext | - |
item.openairecristype | http://purl.org/coar/resource_type/c_18cf | - |
item.grantfulltext | open | - |
item.openairetype | Conference | - |
item.cerifentitytype | Publications | - |
Appears in Collections: | Research Publications (Engineering and Built Environment) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
SAIIE Copyright Clearance.docx | Copyright Clearance | 194.12 kB | Microsoft Word XML | View/Open |
MdletsheDewa_2022.pdf | Article | 505 kB | Adobe PDF | View/Open |
Page view(s)
332
checked on Dec 22, 2024
Download(s)
196
checked on Dec 22, 2024
Google ScholarTM
Check
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.