Please use this identifier to cite or link to this item: https://hdl.handle.net/10321/2309
DC FieldValueLanguage
dc.contributor.authorMashiyane, Thulasizwe Innocent-
dc.contributor.authorOlofintoye, Oluwatosin Onaopemipo-
dc.contributor.authorAdeyemo, Josiah-
dc.date.accessioned2017-03-08T06:22:31Z-
dc.date.available2017-03-08T06:22:31Z-
dc.date.issued2015-
dc.identifier.citationMashiyane, T., Olofintoye, O. and Adeyemo, J. 2015. Maximization of hydropower generation from Hazelmere Dam in South Africa. Environmental Economics. 6(1): 195-199.en_US
dc.identifier.issn1998-605X-
dc.identifier.urihttp://hdl.handle.net/10321/2309-
dc.description.abstractHarnessing more energy from existing water sources within the frontier of the country is germane in capacitating the South African Government’s commitment to reduction of the country’s greenhouse gas emissions and transition to a low-carbon economy while meeting a national target of 3 725 megawatts by 2030. This study aims to determine the amount of energy that can be generated from Hazelmere Dam on the Mdloti River, South Africa. Behavioral analyses of the Hazelmere reservoir were performed using plausible scenarios. Feasible alternative reservoir operation models were formulated and investigated to determine the best operating policy and power system configuration. The optimi-zation models were formulated to maximize hydropower generation while keeping within the limits of existing irriga-tion demands. Differential evolution algorithm was employed to search feasible solution space for the best policy. Findings suggest that if the water resource in the dam is properly managed, about 558.54 MWh of annual energy may be generated from the reservoir under medium flow condition without system failure.en_US
dc.format.extent5 pen_US
dc.language.isoenen_US
dc.publisherBusiness Perspectivesen_US
dc.relation.ispartofEnvironmental economics (Online)-
dc.subjectHydropoweren_US
dc.subjectGreenhouse gasen_US
dc.subjectReservoir operationen_US
dc.subjectDifferential evolutionen_US
dc.subjectBehavioral analysisen_US
dc.titleMaximization of hydropower generation from Hazelmere Dam in South Africaen_US
dc.typeArticleen_US
dc.dut-rims.pubnumDUT-004869en_US
local.sdgSDG07-
local.sdgSDG06-
local.sdgSDG13-
item.fulltextWith Fulltext-
item.cerifentitytypePublications-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.languageiso639-1en-
item.grantfulltextopen-
item.openairetypeArticle-
Appears in Collections:Research Publications (Engineering and Built Environment)
Files in This Item:
File Description SizeFormat
Mashiyane_EE_6_1.pdf91.08 kBAdobe PDFThumbnail
View/Open
Show simple item record

Page view(s)

581
checked on Dec 13, 2024

Download(s)

163
checked on Dec 13, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.